A reorder point is the inventory level at which a business should place a new order so stock arrives before it runs out.
Operations · Reviewed by Ray Rasouli
Ask about reorder point
Plain answers, with your setup in mind.
Ask anything about reorder point. For example, how it works in your current tools.
A scripted guide for now. It does not store what you type.
The reorder point answers one question: when should I buy more? It is usually the demand you expect during the supplier's lead time, plus your safety stock.
Say a hardware store sells about 10 bags of grout a day, the supplier takes 5 days to deliver, and the store keeps 20 bags as safety stock. The reorder point is 70 bags. When stock drops to 70, it is time to order.
Most inventory and ERP systems can watch stock levels and flag or even draft a purchase order when an item hits its reorder point. That only works if the stock count in the system is right and the settings reflect current sales.
The usual flow, step by step.
In practice
Reorder points are guessed, not calculated.
Numbers picked by feel years ago no longer match current sales or lead times.
Seasonal demand is not reflected.
A fixed reorder point that works in winter leaves shelves empty during the spring rush.
Open orders are not counted.
If the system ignores stock already on order, it keeps suggesting new orders and you end up overstocked.
Alerts are ignored because there are too many.
When hundreds of items flag every morning, buyers stop trusting the list and go back to spreadsheets.
A common formula is average daily demand times lead time in days, plus safety stock. For example, 10 per day times 5 days plus 20 safety stock gives a reorder point of 70.
The reorder point says when to order. The reorder quantity says how much to order each time.
A 30-minute discovery call with Ray, then a clear list of what to fix first. No obligation.
With Ray Rasouli. No obligation.