A bill of materials, or BOM, is the complete list of components, raw materials and quantities needed to make one unit of a product.
Operations · Reviewed by Ray Rasouli
Ask about bill of materials (BOM)
Plain answers, with your setup in mind.
Ask anything about bill of materials (BOM). For example, how it works in your current tools.
A scripted guide for now. It does not store what you type.
A BOM is the recipe for a manufactured item. It lists every part, how many of each, and often the order they go together in.
A small manufacturer of outdoor benches might have a BOM listing six slats of cedar, two steel frames, 24 screws and a can of stain per bench. When it plans to build 50 benches, the system multiplies the BOM to see exactly what to buy or pull from stock.
BOMs also drive product cost. Add up each component's cost and you know what a bench should cost to build. Many products have multi-level BOMs, where a sub-assembly has its own BOM inside the larger one.
In practice
The BOM does not match how the product is really built.
The shop floor uses a different part or quantity, so material planning and product cost are both off.
Engineering changes are not controlled.
A part is swapped without updating the BOM or dating the change, and old and new versions get mixed.
Scrap and waste are left out.
If the BOM ignores normal waste, the business runs short of material and underestimates cost.
BOMs live in spreadsheets outside the system.
Planning in the ERP uses one version while the team builds from another kept on a shared drive.
They are the same idea. Food and chemical businesses often call it a recipe or formula, while discrete manufacturers call it a bill of materials.
A multi-level BOM includes sub-assemblies that have their own component lists. For example, a bench frame is built from its own parts, then used in the finished bench.
A 30-minute discovery call with Ray, then a clear list of what to fix first. No obligation.
With Ray Rasouli. No obligation.